At SPR Construction Corporation, our project portfolio is a testament to our commitment to quality, innovation, and precision in Federal Design/Build construction. We specialize in infrastructure development, renovations, and specialty construction, delivering high-performance solutions that meet the highest industry standards. Our diverse projects span government agencies, commercial developments, and large-scale infrastructure improvements across the United States and beyond. With a strong focus on safety, efficiency, and sustainability, we ensure every project is completed on time, within budget, and with lasting impact. Explore our project profiles to see how SPR is shaping communities and transforming the built environment with excellence and expertise.
Project Profiles
Anderson Air Force Base, Guam - Phase 1 Utilities
Agency: NAVFAC Marianas/P&S
Year Completed: 2013
Contract Value: $2.9 Million
Project Location: Anderson Air Force Base, Guam
Description: This project involved the construction of critical utility infrastructure at Anderson Air Force Base, enhancing communication, water, and sewer systems. The scope included the installation of 7,071 linear feet of copper cable conduits (1200 pair) and 2,134 linear feet of optical fiber for communication upgrades.
Water system improvements included the construction of a 16-inch waterline spanning 3,445 linear feet. Sewer system enhancements comprised the installation of 3,710 linear feet of a 10-inch sewer line and 2,770 linear feet of a 12-inch sewer line.
The project was executed in compliance with NAVFAC standards, ensuring reliable and resilient infrastructure to support base operations.
Philadelphia Navy Yard – Building 531 Renovation
Agency: NAVFAC Mid-Atlantic
Year Completed: 2015
Contract Value: $1.9 Million
Project Location: Philadelphia Navy Yard, 4747 S Broad St #120, Philadelphia, PA 19112
Description: This renovation project involved returning Building 531 to its original aesthetic while modernizing its infrastructure. The scope included asbestos and lead abatement, demolition with structural support, and the construction of a new office layout with extensive steel structural modifications. The project also incorporated masonry and concrete work, a new 7,000 SF roof, mechanical and electrical upgrades, new plumbing, and an advanced fire suppression and alarm system.
Additional improvements included new storm drains, sanitary sewer lines, domestic water and fire sprinkler connections, as well as new stairs, railings, doors, windows, shades, cabinetry, and various flooring finishes.
Champlain Cargo Conference Room and Import Specialist Reorganization
Agency: General Services Administration (GSA)
Year Completed: 2017
Contract Value: $1.1 Million
Project Location: Champlain LPOE Cargo Station – GSA Branch, 237 West Service Road, Champlain, NY 12919
Description: This project involved the new construction, reorganization, and renovation of a conference room and office spaces within the Champlain LPOE Cargo Station. The scope included the construction of four new offices, reorganization of workspaces, and the conversion of the existing conference room into a functional space with a kitchen and furniture upgrades.
Additional work included the installation of projectors, partition walls, carpet flooring, new electrical, mechanical, and communication lines. The project was executed in five phases while the facility remained occupied, requiring careful coordination to minimize disruptions. The upgrades enhanced workflow efficiency, infrastructure reliability, and modernized the facility to meet operational needs.
United States Embassy Roof Replacement – Sri lanka
Agency: U.S. Department of State
Year Completed: 2018
Contract Value: $210K
Project Location: 94 Horton Place, Colombo, Sri Lanka
Description: This project involved the removal and replacement of the existing roof system at the U.S. Embassy in Colombo. The scope included full roof demolition, structural inspection, and repairs, followed by installation of a new roofing system. All work was performed with careful attention to security and operational continuity within the diplomatic facility.
Hanley 11th Floor Gym & Office Renovation
Agency: General Services Administration (GSA)
Year Completed: 2019
Contract Value: $824K
Project Location: James M. Hanley Federal Building, 100 S. Clinton Street, Syracuse, NY 13261
Description: This project involved the demolition and renovation of the 11th floor at the James M. Hanley Federal Building to accommodate a new gym and office space. The scope of work included the installation of new partition walls, doors, casework, woodwork, flooring, and updated mechanical, electrical, plumbing, and fire protection systems. Additional improvements included new men’s and women’s restrooms with lockers, showers, and mosaic tile finishes. Sound clouds were installed below the ceiling grid for noise control, and a new training room was constructed with integrated casework and floor boxes. The project required extensive logistics and coordination with multiple subcontractors to ensure smooth execution within an occupied federal facility.
FBI Range 9 Training Center – Design/Build
Agency: U.S. Department of Justice – Federal Bureau of Investigation
Year Completed: 2020
Contract Value: $3.1 Million
Project Location: West Point Range 9, United States Army Garrison, West Point, NY 10996
Description: This project involved the construction of a new 5,500 SF one-story Range 9 Training Building at the West Point Range and Training Complex. Scope included the demolition of an existing classroom building and construction of a new facility housing a dividable classroom for 60 students, secure office suite, weapons storage vault, restroom and shower facilities, break galley, and an enclosed garage for range maintenance vehicles. Work included significant site improvements, utility upgrades (including new potable water well, sanitary septic system, and stormwater management), paving, and grading. The building was designed to meet enhanced fire protection, life safety, and security requirements, and incorporates durable, low-maintenance materials.
West Point Range 9 Tower Building Renovation – Highland Falls, NY
Agency: U.S. Department of Justice – Federal Bureau of Investigation
Year Completed: 2020
Contract Value: $300K
Project Location: West Point Range 9 Control Tower Building, 343 NY-293, Highland Falls, NY 10928
Description: This renovation project involved structural and exterior upgrades to the Range 9 Control Tower at West Point. The scope included replacing the existing modular system with an insulated metal panel system, re-roofing with 60-mil EPDM, and installing a new metal panel exterior wall system. Additional work included applying a fluid air/moisture barrier, sealing glass windows to prevent water infiltration, and reinstalling electrical and communication systems. The upgrades enhanced the durability, energy efficiency, and weather resistance of the facility.
Incinerators Upgrades (Design Build) – Rock Tavern, NY
Agency: U.S. Department of Agriculture (USDA) – APHIS - ASD – SC
Year Completed: 2022
Contract Value: $1.28 Million
Project Location: 474 International Blvd, Rock Tavern, NY 12575
Description: This project involved the design-build upgrade of two incinerators to meet 6 NYCRR air emission standards. The scope included developing construction drawings, installing essential utilities such as meters, transformers, cables, and conduits, and implementing protective measures to ensure the building and occupants remained safe during construction. The project also required the development of standard operating procedures for training, maintenance, and record-keeping, along with the installation of a continuous emission monitoring system. The work was performed under an 8(a) Set-Aside contract and adhered to USDA environmental and operational compliance standards.
C3 & C13 NWS Earle Mold Remediation
Agency: Department of Defense / Naval Facilities Engineering Systems Command (NAVFAC)
Year Completed: 2022
Contract Value: $300K
Project Location: US Army Garrison Fort Devens, Devens Reserve Forces Training Area, MA
Description: This project involved comprehensive mold remediation at Buildings C-3 and C-13, requiring the removal and replacement of mold-contaminated materials, including 3,800 LF of gypsum wallboard, flooring, ceiling tiles, insulation, furniture, and cabinetry. Work also included hazardous material testing and abatement, fire alarm system adjustments, and thorough cleaning with HEPA vacuuming and antimicrobial biocide treatment. Compliance with OSHA, EPA, NJDEP, NFPA, and Army Corps of Engineers EM-385-1-1 standards was a key requirement. The project also mandated a rigorous environmental protection and waste disposal process in adherence to NJDEP regulations.
Morristown National Historic Park – Roadway Improvements
Agency: National Park Service
Year Completed: 2022
Contract Value: $4.5 Million
Project Location: Morristown National Historic Park, NJ
Description: The project focused on pavement management and improvement of access roads throughout Morristown National Historic Park. The scope included asphalt paving and roadway construction spanning approximately 6 miles, enhancing vehicular access and preserving infrastructure within the park's historic setting.
Replace Domestic Hot Water Tanks – Barnes Building
Agency: Department of Defense / USACE
Year Completed: 2024
Contract Value: $900k
Project Location: Barnes Building, 495 Summer Street, Boston, MA
Description: The project involved the replacement of two 1,125-gallon steam domestic hot water heater tanks. Scope included removal and disposal of existing tanks and associated piping, asbestos testing and abatement, and installation of a new domestic steam hot water tank system. The work included new valves, regulators, steam traps, insulation, and recirculation pumps. A temporary hot water system was provided to support ongoing building operations. All work was performed in accordance with NFPA, NEC, ASME, ASTM, and USACE EM 385-1-1 standards, with proper documentation and disposal procedures maintained to meet all regulatory requirements.
USMA Lake Popolopen and Stillwell Dam Emergency Flood Rehabilitation
Agency: US Military Academy / US Army Corps of Engineers
Year Completed: 2024
Contract Value: $3.1 Million
Project Location: West Point, New York
Description: This project involves emergency flood rehabilitation for Lake Popolopen and Stillwell Dam following severe storm damage. The scope includes clearing flood debris, repairing spillway gates, restoring damaged stone masonry walls, stabilizing eroded embankments, and resurfacing affected roads. Additional efforts focus on drainage improvements, infrastructure protection, and erosion control to ensure long-term stability. All work is conducted in compliance with US Army Corps of Engineers standards and environmental regulations.
Exterior Insulated Steel Door Replacement – Fort Devens
Agency: U.S. Army Garrison Fort Devens
Year Completed: 2024
Contract Value: $90K
Project Location: US Army Garrison Fort Devens, Devens Reserve Forces Training Area, MA
Description: This project involved the replacement of insulated exterior steel doors at multiple buildings within Fort Devens. The scope included removal and disposal of existing doors and frames and the installation of new energy-efficient insulated steel doors with thermal glass and steel frames.
The work was completed in compliance with military specifications and security requirements, with a focus on durability, energy efficiency, and enhanced facility security. The upgraded doors contribute to the ongoing modernization efforts at Fort Devens.
US Marshals Conference Room Renovation
Agency: General Services Administration (GSA)
Year Completed: 2024
Contract Value: $272K
Project Location: MLK Building, 50 Walnut Street, Newark, NJ
Description: This design-build project involved the renovation of an existing conference room at the MLK Building for the U.S. Marshals Service. The scope included selective demolition, new partitions, ceiling grid installation, lighting upgrades, electrical rough-in and finishes, flooring replacement, and painting. Additionally, the existing kitchen cabinetry was replaced, and the work was performed with minimal disruption to building operations. The renovation provided an upgraded, functional, and modernized conference space to support agency needs.
Design-Build EPA CID Buildout – Hanley Federal Building
Agency: General Services Administration (GSA)
Year Completed: 2024
Contract Value: $640K
Project Location: James M. Hanley Federal Building, 100 S. Clinton Street, Syracuse, NY 13261
Description: This design-build project involved the renovation and modernization of approximately 1,927 square feet of office space on the second floor of the Hanley Federal Building for the Environmental Protection Agency’s Criminal Investigation Division (EPA CID). The scope included architectural modifications, mechanical, electrical, and plumbing (MEP) upgrades, integration with existing building controls, and structural improvements such as wall infill and finishing.
The project required close coordination with federal stakeholders to ensure compliance with GSA standards, energy efficiency regulations, and security requirements. HVAC upgrades included the replacement of PTAC units with VAV systems featuring electric reheat and specialized cooling for the IT server room. The project adhered to stringent design and construction standards, including PBS P100 and the Architectural Barriers Act Accessibility Standard (ABAAS).
B667 Freight Elevator 5 Replacement
Agency: West Point Academy/U.S. Army Garrison / Department of Public Works (DPW)
Year Completed: 2025
Contract Value: $0.8 Million
Project Location: Building 667, U.S. Army Garrison, West Point, NY
Description: This project involves the full replacement of the existing 5-story, 3,500-lb traction freight elevator in Building 667 to enhance reliability and compliance with modern safety standards. The scope includes new elevator controls, cab, guide rails, wiring, power system verification, and machine room upgrades. The work is performed in accordance with ANSI/ASME 17.1, OSHA, and U.S. Army Engineering Safety regulations. A third-party QEI inspection and one-year maintenance contract are included to ensure long-term functionality and compliance.
US Mint-West Point CRAC Replacement Project
Agency: United States Mint
Year Completed: 2025
Contract Value: $0.7 Million
Project Location: United States Mint at West Point, 1063 NY-218, West Point, NY 10996
Description: We successfully completed the replacement of computer room air conditioning (CRAC) units at the United States Mint-West Point facility, enhancing climate control for critical operations. The project involved removal of outdated units, installation of high-efficiency CRAC systems, and implementation of temporary heating/cooling solutions to ensure continuous operations during the transition.
Our team managed phased execution, scheduling, and stakeholder coordination, adhering to strict security and compliance protocols. The upgraded system significantly improves HVAC efficiency, reliability, and long-term sustainability, supporting the Mint’s operational and environmental standards.
Mess Hall Kitchen Floor Replacement
Agency: West Point Academy/U.S. Army Garrison / Department of Public Works (DPW)
Year Completed: 2025
Contract Value: $1.0 Million
Project Location: Building 745, West Point, NY 10996
Description: This project involved the replacement of the mess hall kitchen floor in Building 745 using Dur-A-Flex Poly-Crete SLB, a high-performance cementitious urethane flooring system. The scope included removal of existing flooring, surface preparation, installation of the new slip-resistant and moisture-mitigating floor system, and integration of an 8” cove base for seamless durability.
Work was performed over long holidays to minimize disruptions, with kitchen equipment uninstalled, relocated, and reinstalled in coordination with facility operations. The upgraded flooring enhances safety, sanitation, and longevity, ensuring compliance with military infrastructure and food service standards in this high-traffic environment.
Renovation of Operations and Training Facility, Building 901
Agency: New York Air National Guard / Niagara Falls Air Reserve Station
Year Completed: Anticipated 2026
Contract Value: $19.4 Million
Project Location: 9910 Blewett Ave, Niagara Falls, NY 14304
Description: This project entails the renovation of Building 901, a critical operations and training facility at the Niagara Falls Air Reserve Station. The scope includes comprehensive architectural, mechanical, electrical, plumbing, fire suppression, and telecommunications system upgrades. Key work elements involve structural reinforcement, fire alarm and security system modernization, HVAC and plumbing system overhauls, and compliance with current IBC, NFPA, and UFC building codes. The project also includes accessibility improvements, energy efficiency upgrades, and modifications to enhance facility functionality for military operations and training.
Repair Utilidor, Vault MN to Vault Q
Agency: Point Academy/U.S. Army Garrison / Department of Public Works (DPW)
Year Completed: Anticipated 2026
Contract Value: $12.3 Million
Project Location: North Formation Area, Between Buildings 745 and 727, Brewerton Road, West Point, NY
Description: This project involves the repair and replacement of concrete steam vault components, steam piping, lighting, electrical systems, and ventilation in Vaults MN, N, O, P, and Q. The scope includes installation of temporary steam bypass piping, demolition of existing infrastructure, concrete repairs, and system upgrades to enhance reliability and efficiency. Work is being carried out in phases to minimize disruptions and is anticipated to be completed by 2026, ensuring long-term system performance and operational improvements while maintaining site integrity.